09-22-2004, 07:09 PM
Orlando Int. Airport expansion
Florida Power & Light Working At Orlando Intern'l Airport
A Florida Power & Light crew putting in lines for an addition to the
Orlando International Airport found the following in a culvert they were
using...
The gator is/was 18' 2" long.
The rattlesnake roundup totaled 87.
Florida Power & Light Working At Orlando Intern'l Airport
A Florida Power & Light crew putting in lines for an addition to the
Orlando International Airport found the following in a culvert they were
using...
The gator is/was 18' 2" long.
The rattlesnake roundup totaled 87.